Others | R STUDİO PROJECT

R STUDİO PROJECT

2 kişi
bu görevi tamamlamak istiyor

Görev Detayı

Project 4 – Modelling and forecasting the relationship between assets’ returns

You have to consider at least 3 assets (equity or stock index or FX or commodity), determine their returns, and model them with the best appropriate VAR model, forecast 1 day ahead, 5 day ahead and 15 days ahead as well as diagnostic test.
1) Model specification: selection of the appropriate VAR model
2) Estimate the selected model
3) Diagnostic test of the estimated models
4) Causality test
5) Impulse response
you should interpret this analysis

Bütçe: 500 TL

İşin Yapılacağı Konum: ONLINE
Görevin Başlangıç Tarihi: 08-01-2023
Görevin Bitiş Tarihi: 13-01-2023
Kategori: Yazılım

GÖREVİ YAPAN KİŞİ